Three level log post deck with water residence pans and gutter on upper level. Redwood decking and shingle siding. Construction completed primarily by Mr. Rafael Quevedo and Mr. Eddie Guerrero.

Built for
http://www.lindsayconstructiontahoe.com

Log railing system by:
Http://www.brownchicken.com

20130520-195848.jpg

Filed under: Completed projects

Like this post? Subscribe to my RSS feed and get loads more!